My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-09-19_REVISION - M2008076
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2008076
>
2018-09-19_REVISION - M2008076
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2025 5:00:09 AM
Creation date
9/19/2018 3:01:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008076
IBM Index Class Name
REVISION
Doc Date
9/19/2018
Doc Name
Completeness Response
From
Robinson Sons
To
DRMS
Type & Sequence
AM1
Email Name
AME
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT D MINING PLAN <br /> 1. General Mining Plan <br /> All areas to be mined are considered high and dry with no groundwater to be encountered during <br /> mining. The deposit is fairly deep ranging from 12 feet deep to possibly 18 feet deep along the <br /> upland deposit. <br /> Excavation is to be an open pit with the use of standard mining equipment used for such <br /> operations eg. front end loader, dozer, and excavator. However due to the life of this mine other <br /> types of equipment not yet economical for gravel may be employed in the future. <br /> Processing will take place on site in order to size by crushing and screening and to reject material <br /> that will be used for final reclamation. <br /> Mining will be conducted in such a way as to facilitate reclamation such as pushing slopes to a <br /> 3H:1 V aspect ratio. Reclamation will follow in a timely manner once an area is deemed mined <br /> out. Seeding and final grading will be to a final reclamation use of pastureland and residential <br /> which the landowner has prescribed. <br /> The following will address the items listed under Rule64 Exhibit D in order of appearance. <br /> Please see Map C-2 for more information and correlations. <br /> Like similar open pit sand and gravel operations this pit will be stripped of the available topsoil <br /> growth medium as indicated on the Soil Report by earthmoving scrapers and loaders and will be <br /> placed along the areas bounding the mining areas and left in place until needed for re-topsoiling. <br /> These topsoil stockpiles will be seeded to reduce soil erosion. <br /> All earthmoving will be done by mining equipment suitable for this type operation including the <br /> following types: front end loader, dozer, excavator, and haul trucks of various sizes and capacity. <br /> The only water diversions would be for stormwater management to keep all stormwater from <br /> running into or off site and for erosion control.No water impoundments are planned at this site. <br /> The proposed mining would be done in the direction shown on the Mining Plan Map C-2 of this <br /> application. Each of the disturbed areas shown on Map C-2 will be mined out starting from the <br /> Robinson Gravel No 1 <br /> September 2018 D-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.