Laserfiche WebLink
The following list is the best estimate as to the equipment which will be used onsite throughout <br /> the mine life: <br /> - Front end loader <br /> - Bulldozer <br /> - Excavator <br /> - 1 40G Motor grader <br /> - 1 4000 gallon water truck <br /> - off-highway road haul trucks (number will depend upon production needs) <br /> - 15 and 24 ton on-road haul trucks (number will depend upon production needs) <br /> The single 500 gallon diesel fuel tank is double walled, which provides for the required secondary <br /> containment. The fuel tank will be kept in the main pit. See Map C-2. <br /> No night mining activity is scheduled for the operation; however portable lighting may be used <br /> within the pit from time to time. The portable lights will only be used at the bottom of the pit for <br /> the purpose of after hour equipment maintenance and crushing activities within the permitted hours <br /> in the winter months while the days are shorter. Portable toilets will be used for employees. All <br /> mining structures on site are shown on Map C-2. The portable mining equipment such as loaders, <br /> dozers, trucks, and excavators will be serviced on an as-needed basis onsite. Upon reclamation, <br /> all portable equipment will be removed from the site. <br /> There will be no new fence around the operation, since it is inside private property. No problems <br /> are expected with vandalism. It is extremely unlikely that any toxic or acid-producing materials <br /> will be encountered during the mining operation since the past mining shows that the material is <br /> alluvial in nature. However, in the event that such materials are encountered,they will be covered <br /> with subsoil and topsoil from the stockpiles to the same depths outlined in the reclamation plan <br /> and no more mining will occur in this area. <br /> The operator commits to clearly marking the permit boundary with stakes surveyed on site. <br /> No designated chemicals or acid-producing materials to be used or stored on-site. <br /> Robinson Gravel No 1 <br /> September 2018 D-5 <br />