2018-09-18_PERMIT FILE - M2018048
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2018048
>
2018-09-18_PERMIT FILE - M2018048
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2025 4:49:51 AM
Creation date
9/18/2018 2:33:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2018048
IBM Index Class Name
PERMIT FILE
Doc Date
9/18/2018
Doc Name
Adequacy Review Response
From
SEMA Construction
To
DRMS
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Subcontract#: 061804-017 <br /> Page 8/Rev 171204 <br /> Sema will construct a 6' level, compacted track line for Contractor paving operations at no additional <br /> charge, to the extent that there are no interfering obstructions and available offset space exists. <br /> Clearing and Grub includes all clearing required for the project, except items broken out separately. <br /> Topsoil used to construct temporary erosion control berms will be paid as Temporary Berm and the <br /> neat line volume of 0.13 CY/LF of temporary berm will be deducted from the Stockpile Topsoil item. <br /> All flared end sections include required cut-off/toe walls. <br /> Rip Rap items include geotextile fabric if required. <br /> Detour items include only the work additional to what is required for the permanent features on the <br /> project. <br /> Excludes any subsidiary costs for stockpile location land rental, pad preparation, erosion control <br /> BMPs, unloading/stacking of materials, stockpile maintenance/protection, and reclamation. <br /> All CDOT supplied aggregate materials supplied at no cost based on sufficient quantities to construct <br /> the contracted work scopes with allowances for ground/handling loss, compaction shrinkage, allowed <br /> tolerances and reasonable overbuilds. <br /> Assumes CDOT stockpile placement within %mile of the 1-25 corridor at 3 stockpile locations <br /> equidistantly distributed along the project alignment. <br /> CDOT is the producer of the material and warrants that all material supplied meets project <br /> specifications at point of fill placement within the project—SEMA will not be responsible for stockpile <br /> contamination, mechanical breakdown caused by repeated handling events, and weathering of <br /> materials. CDOT will provide 200,000 CY of Aggregate Base Course(CI6) material, which based on <br /> the standard CDOT unit weight conversion factor 133 PCF will yield—359,000 tons of material. This <br /> minimum supplied tonnage of aggregate material will be calculated and mutually agreed by surveyed <br /> stockpiled volumes and average in-place density measurements. The CDOT unit weight conversion <br /> factor used to calculate minimum stockpile tonnage may be adjusted up or down based on mutually <br /> agreed actual maximum proctor density of the source material. In addition to the 200,000 <br /> CY/359,000ton stockpile, an additional 40,000 CY(20%) of aggregate material will be stockpiled to <br /> provide supplemental material to cover anticipated stockpile losses and construction overbuilds. Any <br /> overruntwaste in excess of this total agreed amount will be the responsibility of SEMA. Supplemental <br /> procedures to determine stockpile quantities in relation to delivery and construction logistics will be <br /> mutually determined and agreed by both parties. <br /> DBE participation: Quoted work scope includes a minimum $450,000 in DBE participation from Tom <br /> Calabrese Trucking based on bid form scope and quantities with no added cost. Additional DBE <br /> participation may be available with an additional cost premium of 11% if mutually agreeable. <br /> If SEMA Precast is awarded the supply of precast soundwall materials and precast MSE Panel/SN <br /> Panel Facing SEMA Construction agrees to provide additional DBE participation (additional to the <br /> $450k) to fulfill a 100% DBE dollar value of the SEMA Precast final PO amount. Example, if the final <br /> PO dollar amount to SEMA Precast is $978,893, and DBE dollars specific to SEMA Precast total <br /> $215,000, SEMA Construction agrees to contribute an additional DBE amount of$763,893. (i.e. <br /> SEMA Precast Contract minus SEMA Precast DBE Commitment equals additional SEMA <br /> Construction DBE Commitment.) Final DBE contribution will be based on final wall quantities. To fulfill <br /> Equal Opportunity/Affirmative Action Employer <br />