Laserfiche WebLink
Cripple Creek&Victor Gold Mining Company IIIIIIIIIIIIIENewlFields <br /> VLF2 Recertification Subgrade&Geomembrane 9750'-9900' Persportive.Vision..SOlutions. <br /> Geomembrane Fusion Trial Seam Summary <br /> Machine Settings Test Results <br /> Sample Machine <br /> Ambient Inside Peel Outside Peel Shear <br /> QA <br /> Date Number Number Pass/Fail Monitor Time Operator Air Temp. Temp. Speed (Min.=100 ppi) (Min.=100 ppi) (Minimum=120 ppi) Remarks <br /> (°F) ("F) (ft/s) Strength Model Strength Model Strength Model <br /> (ppi) (ppi) (ppi) <br /> 141 SE1 136 SE1 161 BRK PASS BM <br /> 142 SE1 152 SE1 159 BRK PASS BM <br /> 7/2/2018 RCTF-18 6:20 AM 43 TA 50 850 8 136 SE1 136 SE1 167 BRK PASS BM <br /> 140 SE1 147 SE1 157 BRK PASS BM <br /> 141 SE1 135 SE1 164 BRK PASS BM <br /> 137 SE1 139 SE1 159 BRK PASS BM <br /> 134 SE1 142 SE1 169 BRK PASS BM <br /> 7/2/2018 RCTF-19 7:45 AM 43 TA 58 850 8 141 SE1 148 SE1 165 BRK PASS BM <br /> 140 SE1 149 SE1 166 BRK PASS BM <br /> 131 SE1 148 SE1 166 BRK PASS BM <br /> 145 SE1 143 SE1 157 BRK PASS IBM <br /> 150 SE1 153 SE1 164 BRK PASS BM <br /> 7/7/2018 RCTF-20 6:00 AM 43 TA 53 850 8.5 144 SE1 148 SE1 168 BRK PASS BM <br /> 149 SE1 149 SE1 164 BRK PASS BM <br /> 153 SE1 145 SE1 164 IBRK PASS BM <br /> 145 SE1 142 SE1 155 BRK PASS BM <br /> 148 SE1 148 SE1 160 BRK PASS BM <br /> 7/7/2018 RCTF-21 7:15 AM 43 TA 55 850 7.5 146 SE1 150 SE1 156 BRK PASS BM <br /> 151 SE1 147 SE1 165 BRK PASS BM <br /> 145 SE1 141 SE1 153 BRK PASS BM <br /> 130 SE1 139 SE1 138 BRK PASS BM <br /> 127 SE1 133 SE1 138 IBRK PASS BM <br /> 7/7/2018 RCTF-22 11:20 AM 43 TA 63 850 7.5 131 SE1 131 SE1 137 IBRK PASS BM <br /> 129 SE1 136 SE1 140 IBRK PASS BM <br /> 121 SE1 134 SE1 139 IBRK PASS BM <br /> 133 SE1 145 SE1 153 IBRK PASS IBM <br /> 139 SE1 153 SE1 160 BRK PASS BM <br /> 7/9/2018 RCTF-23 9:00 AM 43 TA 60 850 7.5 141 SE1 156 SE1 161 BRK PASS BM <br /> 137 SE1 153 SE1 162 BRK PASS BM <br /> 149 SE1 145 SE1 159 BRK PASS BM <br /> Page 2 of 2 1See Figure 1 for Modes <br />