Laserfiche WebLink
Cripple Creek&Victor Gold Mining Company ■■NewFlelds <br /> VLF2 Recertification Subgrade&Geomembrane 9750'-9900' Perspwtivn.Wdon.Solutions. <br /> Geomembrane Fusion Trial Seam Summary <br /> Machine Settings Test Results <br /> Ambient Inside Peel Outside Peel Shear <br /> Sample Machine QA <br /> Date Number Number Time Operator Air Temp. Temp. Speed (Min.=100 ppi) (Min.=100 ppi) (Minimum=120 ppi) Pass/Fail Monitor Remarks <br /> (°F) ('F) (ft/s) Strength 1 Strength 1 Strength 1 <br /> (ppi) Mode (ppi) Mode (ppi) Mode <br /> 1S2 SE1 143 SE1 167 BRK PASS BM <br /> 145 SE1 158 SE1 156 BRK PASS BM <br /> 6/27/2018 RCTF-12 7:10 AM 43 TA 46 850 7 1S5 SE1 139 SE1 162 BRK PASS BM <br /> 149 SE1 150 SE1 162 BRK PASS BM <br /> 150 SE1 151 SE1 166 BRK PASS BM <br /> 136 SE1 133 SE1 155 BRK PASS BM <br /> 131 SE1 133 SE1 154 BRK PASS BM <br /> 6/27/2018 RCTF-13 7:10 AM 43 TA 46 850 8 133 SE1 135 SE1 151 BRK PASS BM <br /> 141 SE1 134 SE1 161 BRK PASS BM <br /> 132 SE1 131 SE1 155 BRK PASS BM <br /> 112 SE1 120 SE1 143 BRK PASS BM <br /> 121 SE1 125 SE1 139 JBRK PASS BM <br /> 6/27/2018 RCTF-14 1:20 PM 43 TA 70 850 9 117 SE1 120 SE1 141 BRK PASS BM <br /> 122 SE1 123 SE1 135 BRK PASS BM <br /> 120 SE1 120 SE1 144 BRK PASS BM <br /> 134 SE1 138 SE1 158 BRK PASS BM <br /> 141 SE1 141 SE1 159 BRK PASS BM <br /> 6/28/2018 RCTF-15 8:00 AM 43 TA 60 850 7.5 141 SE1 1365 SE1 157 JBRK PASS BM <br /> 144 SE1 137 SE1 162 JBRK PASS BM <br /> 134 SE1 143 SE1 160 JBRK PASS BM <br /> 154 SE1 145 SE1 152 BRK PASS BM <br /> 150 SE1 150 SE1 155 BRK PASS BM <br /> 6/29/2018 RCTF-16 10:00 AM 43 TA 60 850 9 140 SE1 142 SE1 154 BRK PASS BM <br /> 154 SE1 145 SE1 148 BRK PASS BM <br /> 161 SE1 142 SE1 157 BRK PASS BM <br /> 128 SE1 127 SE1 132 IBRK PASS BM <br /> 134 SE1 132 SE1 147 BRK PASS IBM <br /> 6/29/2018 RCTF-17 1:30 PM 43 TA 70 850 10 123 SE1 130 SE1 134 BRK PASS BM <br /> 129 SE1 122 SE1 141 BRK PASS BM <br /> 125 SE1 131 SE1 141 BRK PASS BM <br /> Page 1 of 2 1See Figure 1 for Modes <br />