My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-09-11_REPORT - M1980244 (3)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2018-09-11_REPORT - M1980244 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2025 4:39:11 AM
Creation date
9/11/2018 4:28:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
9/11/2018
Doc Name Note
Part 3 of 4
Doc Name
Construction Quality Assurance Report (CQA)
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Daily Report . <br /> VLF2 Geomembrane Recertification <br /> 475.0106.026 . <br /> July 6,2018 <br /> 2.3 Geomembrane Removal <br /> Comanco cut and removed the geomembrane liner using CX210C CASE Excavator between 9850' <br /> bench and 9900' bench. <br /> 3.0 NEWFIELDS ACTIVITIES <br /> NewFields personnel observed DCF placement, geomembrane removal, and anchor trench <br /> excavation during the shift. <br /> 4.0 COMMUNICATIONS AND MEETINGS <br /> NewFields personnel attended a project pre-shift safety meeting conducted by Ames <br /> Construction. <br /> If you have any questions or require additional information, please contact us at your <br /> convenience. <br /> Sincerely, <br /> NewFields Mining Design &Technical Services <br /> Prepared by: Benjamin Melly. 817.889.7315 <br /> DCF Placement <br />
The URL can be used to link to this page
Your browser does not support the video tag.