Laserfiche WebLink
NewFields <br /> Perspective. Vision. Solutions. <br /> FIELD DAILY PROGRESS REPORT <br /> Client: Cripple Creek&Victor Gold Mining Company <br /> Project: VLF2 Geomembrane Recertification <br /> NewFields Project Number: 475.0106.026 <br /> Date: July 6, 2018 <br /> S M T W T F S <br /> Temperature: Low: 50°F to High: 69°F Weather: Mostly Cloudy <br /> NEWFIELDS PERSONNEL <br /> Name Hours <br /> Benjamin Melly 12 <br /> Alex Lewallen 8 <br /> 1.0 AMES CONSTRUCTION ACTIVITIES <br /> 1.1 Drain Cover Fill Placement <br /> A Cat D6T LGP dozer continued to push and place Drain Cover Fill (DCF) material between 9650' <br /> bench and 9735' elevation in a minimum of two-foot lift. <br /> 1.2 Anchor Trench Excavation <br /> A Cat 336F and A Cat 305.5 E mini excavator were used to complete the excavation of anchor <br /> trench on the 9900' bench. <br /> 2.0 COMANCO ACTIVITIES <br /> 2.1 Geomembrane Acceptance <br /> No activities during the shift <br /> 2.2 Geomembrane Installation <br /> No activities during the shift <br />