My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-09-11_REPORT - M1980244 (3)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2018-09-11_REPORT - M1980244 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2025 4:39:11 AM
Creation date
9/11/2018 4:28:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
9/11/2018
Doc Name Note
Part 3 of 4
Doc Name
Construction Quality Assurance Report (CQA)
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NewFields <br /> Perspective. Vision. Solutions. <br /> FIELD DAILY PROGRESS REPORT <br /> Client: Cripple Creek&Victor Gold Mining Company <br /> Project: VLF2 Geomembrane Recertification <br /> NewFields Project Number: 475.0106.026 <br /> Date: July 6, 2018 <br /> S M T W T F S <br /> Temperature: Low: 50°F to High: 69°F Weather: Mostly Cloudy <br /> NEWFIELDS PERSONNEL <br /> Name Hours <br /> Benjamin Melly 12 <br /> Alex Lewallen 8 <br /> 1.0 AMES CONSTRUCTION ACTIVITIES <br /> 1.1 Drain Cover Fill Placement <br /> A Cat D6T LGP dozer continued to push and place Drain Cover Fill (DCF) material between 9650' <br /> bench and 9735' elevation in a minimum of two-foot lift. <br /> 1.2 Anchor Trench Excavation <br /> A Cat 336F and A Cat 305.5 E mini excavator were used to complete the excavation of anchor <br /> trench on the 9900' bench. <br /> 2.0 COMANCO ACTIVITIES <br /> 2.1 Geomembrane Acceptance <br /> No activities during the shift <br /> 2.2 Geomembrane Installation <br /> No activities during the shift <br />
The URL can be used to link to this page
Your browser does not support the video tag.