Laserfiche WebLink
Daily Report ■ <br /> VLF2 Geomembrane Recertification <br /> 475.0106.026 . <br /> July 9,2018 <br /> 2.2 Geomembrane Installation <br /> Approximately 110 linear feet of fusion seaming was performed using one fusion <br /> machine/operator combination. One destructive testing sample was marked during fusion <br /> seaming. Non-destructive testing was performed for fusion welded seams. Repairs were <br /> performed during the shift, but not vacuum tested. Comanco used the sandbags to secure <br /> geomembrane in place. <br /> 3.0 NEWFIELDS ACTIVITIES <br /> NewFields personnel observed DCF placement, anchor trench backfill, and geomembrane <br /> installation during the shift. Geomembrane acceptance for DCF placement was also performed. <br /> 4.0 COMMUNICATIONS AND MEETINGS <br /> NewFields personnel attended a project pre-shift safety meeting conducted by Ames <br /> Construction. <br /> If you have any questions or require additional information, please contact us at your <br /> convenience. <br /> Sincerely, <br /> NewFields Mining Design &Technical Services <br /> Prepared by: Benjamin Melly. 817.889.7315 <br />