My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-09-11_REPORT - M1980244 (3)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2018-09-11_REPORT - M1980244 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2025 4:39:11 AM
Creation date
9/11/2018 4:28:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
9/11/2018
Doc Name Note
Part 3 of 4
Doc Name
Construction Quality Assurance Report (CQA)
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
■NewFields <br /> ■Perspective.Vision.Solutions. <br /> FIELD DAILY PROGRESS REPORT <br /> Client: Cripple Creek&Victor Gold Mining Company <br /> Project: VLF2 Geomembrane Recertification <br /> NewFields Project Number: 475.0106.026 <br /> Date:July 9, 2018 <br /> S M ! T W T F S <br /> Temperature: Low: 50°F to High: 74°F Weather: Partly Cloudy <br /> NEWFIELDS PERSONNEL <br /> Name Hours <br /> Benjamin Melly 13 <br /> 1.0 AMES CONSTRUCTION ACTIVITIES <br /> 1.1 Drain Cover Fill Placement <br /> Ames continued Drain Cover Fill (DCF) placement using a CAT D6 LGP dozer. DCF material was <br /> delivered and stockpiled near the recertification area by mine operations traveling on at least 20- <br /> feet of geomembrane cover at all times. <br /> 1.2 Anchor Trench backfill <br /> Anchor trench was backfilled on 9900' bench using a CAT 312C L excavator equipped with <br /> vibratory plate compactor and laborers. Approximately 25 feet of temporary anchor trench was <br /> completed with the placement of Soil Liner Fill (SLF) in accordance with technical specification. <br /> 2.0 COMANCO ACTIVITIES <br /> 2.1 Geomembrane Acceptance <br /> Panels PRC-17 thru PRC-32 were inspected and approved for DCF placement by CC&V, Ames, <br /> Comanco, and NewFields representatives. <br />
The URL can be used to link to this page
Your browser does not support the video tag.