Laserfiche WebLink
Daily Report . <br /> VLF2 Geomembrane Recertification <br /> 475.0106.026 ■ <br /> June 25,2018 <br /> 2.0 COMANCO ACTIVITIES <br /> 2.1 Geomembrane Installation <br /> One destructive test was marked, tested, and the location was repaired using the extrusion <br /> welding method. All non-destructive and destructive test results met project specifications. <br /> 3.0 NEWFIELDS ACTIVITIES <br /> Newfield personnel observed DCF removal, anchor trench excavation and geomembrane <br /> removal during the shift. <br /> 4.0 COMMUNICATIONS AND MEETINGS <br /> NewFields personnel attended a project pre-shift safety meeting conducted by Ames <br /> Construction. <br /> If you have any questions or require additional information, please contact us at your <br /> convenience. <br /> Sincerely, <br /> NewFields Mining Design &Technical Services <br /> Prepared by: Benjamin Melly. 817.889.7315 <br />