Laserfiche WebLink
■NewFields <br /> Perspective.Vision.Solutions. <br /> FIELD DAILY PROGRESS REPORT <br /> Client: Cripple Creek&Victor Gold Mining Company <br /> Project: VLF2 Geomembrane Recertification <br /> NewFields Project Number: 475.0106.026 <br /> Date:June 25, 2018 <br /> S M T W T F S <br /> Temperature: Low:43°F to High: 74°F Weather: Partly Cloudy <br /> NEWFIELDS PERSONNEL <br /> Name Hours <br /> Benjamin Melly 13 <br /> Alex Lewallen 12 <br /> 1.0 AMES CONSTRUCTION ACTIVITIES <br /> 1.1 DCF Removal <br /> A Cat 312 CL Excavator was utilized to remove the Drain Cover Fill (DCF) on 9750' bench exposing <br /> the existing geomembrane. <br /> 1.2 Anchor Trench Excavation <br /> A CAT 305.5 E mini excavator was used to excavate approximately 84 feet of anchor trench on <br /> the 9850' bench. <br /> 1.3 Geomembrane Removal <br /> A Cat 336 F excavator was used to remove geomembrane and expose the Soil Liner Fill (SLF) <br /> between 9750' and 9850' bench. <br />