Laserfiche WebLink
Vo I I m e r Pit — ' — ' — ' ' Original Permit Boundary = 80 acres <br /> Schmidt Construction Company Land Requested for FIRST 2018 Release (measurements shown are approximate) _ <br /> 26.2 acres. None of this land has ever been affected by mining. APPROVED. <br /> Second Release Map <br /> September 2018 Remaining Affected Land to be Reclaimed = 45.2 acres <br /> Permit: M-83-035 <br /> Land Requested for SECOND 2018 Release = 8.6 acres. <br /> (berms in this area were approved to remain and be released in TR05). <br /> NOTE: All measurements are approximate and are derived from the FIRST 2018 RELEASE. <br /> p'(��3i� � ;0 <br /> N Qa, <br /> A <br /> i <br /> .. 9 44 <br /> 1 400' <br /> 0 200 400 <br /> ,i _ R � •� � � -� � - - - - � -DIY° �� <br /> Note on Future Reclamation: The 50' setback from actual disturbed land is provided for access for RECEIVED o <br /> reclamation of the disturbed land. <br /> SEP 10 2018 <br /> Vote: This is a newly formatted DMSION OF RECLAMATION <br /> map produced on a 2017 satellite MINING&SAFETY <br /> image. <br />