Laserfiche WebLink
stable reclaimed configuration and will minimize disturbance to the <br /> hydrologic balance. <br /> (m) Specify if the deposit will be processed on-site. If the deposit will be <br /> processed, then describe the nature of the process, facilities and chemicals <br /> used. The process area and any structures must be described on Exhibit E— <br /> Map: <br /> No on-site processing will take place. <br /> (n) Identification of the primary and secondary commodities mined and <br /> intended uses: <br /> The primary product (commodities) excavated from this mine site will be borrow <br /> material to be utilized as embankment material on the adjacent construction <br /> project. No secondary commodities will be produced. <br /> (o) Identification of the expected incidental products mined and intended <br /> uses: <br /> No incidental products will be mined. <br /> (p) Specify if explosives will be used in conjunction with the mining or <br /> reclamation. In consultation with the Office, the Applicant must <br /> demonstrate, pursuant to Subsection 6.5(4), Geotechnical Stability Exhibit, <br /> that off-site areas will not be adversely affected by blasting during mining or <br /> reclamation: <br /> No use of explosives will be used during mining or reclamation. <br /> 27 <br />