Laserfiche WebLink
properly routed around disturbed areas, and/or properly controlled from the site as <br /> storm water runoff. (If required, the Stormwater Management Plan will also <br /> comply with agency requirements.) <br /> (A Stormwater Permit is only required where an operation has the possibility of a <br /> discharge to state waters or from storm water that may come into contact with any <br /> overburden, raw. materials, intermediate products, finished products,by products <br /> or waste products located at the site of such operations.) <br /> 0) Description how the Operation will comply with applicable Colorado <br /> water laws and regulations governing injury to existing water rights: <br /> • The operator/applicant will comply with Colorado water quality laws and <br /> regulations governing injury to existing water rights. It is not anticipated <br /> that any water will be encountered. If ground water is encountered, the <br /> proper steps at the State Engineers office will be complied with. <br /> • Any water used for fugitive dust control will be purchased. <br /> (k) If refuse and acid or toxic producing materials ware exposed during <br /> mining, describe how they shall be handled and disposed of in a manner that <br /> will control unsightliness and protect the drainage system form pollution: <br /> No acid or toxic materials will be used or encountered on this site. <br /> (1) Description what measures will be taken to minimize disturbance to <br /> the hydrologic balance, prevent off-site damage, and provide for a stable <br /> configuration of the reclaimed area consistent with the proposed future land <br /> use: <br /> • The hydrologic balance will not be influenced by removal of borrow <br /> material. The initial preparation of the surface before extraction of borrow <br /> material will consist of stripping the topsoil and placing topsoil in a <br /> stockpile for use later during reclamation. Front-end loaders, scrapers, <br /> excavators or other suitable equipment will be used in order to remove <br /> topsoil and borrow material as quickly as possible followed by site <br /> reclamation. The short duration of the borrow operation and timely site <br /> reclamation will minimize impacts to the hydrologic balance. <br /> • SEMA's Corporate Stormwater Management Plan will be implemented to <br /> protect the hydrologic balance. <br /> • Ground water will not be intercepted or otherwise impacted. <br /> • The reclaimed surface will be returned to land suitable for rangeland. The <br /> pit slopes will be 3H:1 V or less. Upon completion of mining, all runoff will <br /> be contained within the pit and will infiltrate into the ground water system. <br /> The subsoils are gravel and sands and will minimize any significant <br /> ponding or retention of tributary waters. These measures will ensure a <br /> 26 <br />