drainageways. <br /> ➢ The location for the topsoil stockpile and its access road are shown on <br /> the Pre-mine Mine Plan Map. <br /> ➢ The entire area for topsoil storage should be adequate as a temporary <br /> storage area. It is free of drainages, is fairly flat. <br /> ➢ Appropriate storm water management control will be implemented <br /> around the topsoil stockpile. <br /> ➢ Given the short duration of the borrow operation,the topsoil stockpile will not <br /> be seeded. The topsoil stockpile will be left rough as placed. Once borrow <br /> material is removed and final grading and discing(as needed)is complete,the <br /> topsoil stockpile will be removed and the topsoil replaced on the final regrade. <br /> ➢ However, in the unlikely event the stockpile is not used for site reclamation <br /> within one year, it will be seeded with the approved reclamation seed mix. The <br /> topsoil stockpile location and its access road will then be reclaimed. <br /> (c) Specify the thickness of overburden or quantity of waste rock, if any, <br /> to be removed to reach the deposit. The location of any overburden <br /> stockpiles or waste rock fill must be shown on Exhibit E—Map: <br /> This mining operation is a borrow pit. Once the adequate topsoil is removed, all <br /> excavated material will be used as borrow material. <br /> (d) Specify the thickness of the deposit to be mined: <br /> Maximum removal depth will be approximately 6 feet. We plan to remove up to <br /> 250,000 cubic yards of material. <br /> (e) Describe the major components of the mining operation such as: roads, <br /> access routes, pit, office, shop/maintenance buildings, plant, processing <br /> facilities, and any underground openings such as adits or ventilation facilities. <br /> These components must be located on Exhibit E—Map: <br /> • All major components are shown on Exhibit E—Pre-Mine/Mine Plan Map. <br /> • The operation will consist of an access road allowing borrow material to be <br /> loaded and hauled to the CDOT project construction site. The existing <br /> access road will be modified as needed to permit safe access off County <br /> Road 46 to the borrow area. The access road will be reclaimed once <br /> mining and site reclamation operations are completed. <br /> • All haul roads interior to the borrow site will be maintained during mining <br /> operations to be safe and to function properly. <br /> • Road maintenance will include maintaining proper drainage, runoff <br /> controls, and dust control as needed. <br /> • No on-site scale,processing facility, office, shop/maintenance facility, plant, <br /> or any underground openings will be created or needed. <br /> (f) Specify the dimensions of any significant disturbance to the land surface <br /> such as pit excavations, mine benches, impoundments, stockpiles,waste rock <br /> disposal areas, etc: <br /> 24 <br />