6.3.3 EXHIBIT C <br /> Mining Plan <br /> 6.3.3 Mining Plan description: <br /> The purpose of the mining plan is to describe how mining will affect the permit area for the <br /> duration of the operation. This plan must be correlated to Exhibit E—Map. The <br /> description of the mining plan must be adequate to satisfy the requirements of Section 3.1 <br /> and demonstrate compliance with Rule 3. At a minimum, the Operator/Applicant must <br /> include the following information: <br /> (1) The purpose of the mining plan is to describe how mining will affect the permit <br /> area for the duration of the operation. This plan must be correlated to Exhibit E— <br /> Map: <br /> (a) The estimated dates mining will begin and end. If the operation is <br /> intended to be an intermittent operation as defined in by statute,the <br /> Applicant should include in this exhibit a statement that conforms to the <br /> provisions of the Statutory requirements: <br /> • The proposed operation will not be an intermittent mining operation. <br /> • Mining operations will begin once all required permits are in place. This is <br /> a CDOT roadway project and removal of the borrow material from the site <br /> should require less than nine months once the project begins. Removal of <br /> borrow material from the site and site reclamation should be completed <br /> prior to the end of 2019. <br /> (b) The estimated depth topsoil will be salvaged, specify how the topsoil <br /> will be stockpiled and stabilized with a vegetative cover or other <br /> means until used in reclamation. Topsoil stockpiles must be protected <br /> from mine operations traffic, stream channels or drainageways. The <br /> location must be shown on Exhibit E—Map: <br /> • The average depth of topsoil removed will be 12 inches. We estimate <br /> approximately 41,834 Cubic Yards cyds of topsoil will be needed for site <br /> reclamation. (25.93 acres X 1,613.33 cyds in one acre, one foot deep = <br /> 41,834 cyds.) <br /> • The two major soils units are Aquolls and Aquents, Map symbol 3 (about <br /> 67% of the area) and Bankard sandy loam, Map symbol 10(about 32% of <br /> the area). <br /> ➢ Map symbol 3, upper soil is 0"to 48" inches, loam. <br /> ➢ Map symbol 10 upper soil is 0" 9" sandy loam. <br /> ➢ We will obtain the 12 inches of replacement topsoil from Map Unit 3 <br /> symbol 3 and 10. <br /> • Location of the topsoil stockpiles indicated on the Pre-mine/Mine Plan Map <br /> will protect the topsoil pile from mining operations and is out of <br /> 23 <br />