My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-08-17_REVISION - C1981028
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981028
>
2018-08-17_REVISION - C1981028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2018 8:22:27 AM
Creation date
9/7/2018 9:18:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
Revision
Doc Date
8/17/2018
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Coors Energy Company
Type & Sequence
SL9
Email Name
RAR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION Task #: AO5 State: Colorado Abbreviation: None <br />Date: 8/16/2018 County: Weld Filename: C028-AO5 <br />User: RAR Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COST Basic Machine: CAT 14M Horsepower: 259 <br />Ripper Attachment: Shift Basis: 1 per day <br /> Data Source: (CRG) Cost Breakdown: <br /> Utilization % <br />Ownership Cost/Hour: $60.13 NA <br />Operating Cost/Hour: $50.87 100 <br />Ripper Ownership Cost/Hour: $0.00 NA <br />Ripper Operating Cost/Hour: $0.00 <br />Operator Cost/Hour: $45.64 NA <br />Total Unit Cost/Hour: $156.64 Total Fleet Cost/Hour: $156.64 <br /> <br />MATERIAL QUANTITIES Total Area to be graded or ripped: 12.50 acres Source of estimated acreage: SL9 APPLICATION <br /> <br />HOURLY PRODUCTION Average Grader Speed: 3.25 mph <br />Selected Application: Heavy blading (0-6 mph) - 3.25 <br />Selected Blade Angle: 30 degrees <br />Effective Blade Length: 12.10 feet <br />Width of blade overlap per pass: 2.00 feet <br />Net grading or ripping width per pass: 10.10 feet <br />Unadjusted Hourly Unit Production: 3.9788 acres/hour Job Condition Correction Factors Site Altitude: 4000 feet <br /> Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.90 (1sh/d, fav.) <br />Net Correction: 0.9000 multiplier Adjusted Hourly Unit Production: 3.5809 acres/Hour <br />Adjusted Hourly Fleet Production: 3.5809 acres/Hour <br /> <br />JOB TIME AND COST Fleet size: 1 Grader(s) Total job time: 3.49 Hours <br /> <br />Unit cost: <br /> <br />$43.74 <br /> <br />per acre <br /> <br />Total job cost: <br /> <br />$547 <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.