Laserfiche WebLink
CIRCES Cost Estimating Software <br />COST SUMMARY WORK <br /> <br />Task description: 000 SL9 Site: Keenesburg Strip Mine Permit Action: SL9 Permit/Job#: C1981028 <br /> <br />PROJECT IDENTIFICATION Task #: 000 State: Colorado Abbreviation: None <br />Date: 8/16/2018 County: Weld Filename: C028-000 <br />User: RAR Agency or organization name: DRMS <br /> <br />TASK LIST (DIRECT COSTS) <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br /> <br />Cost <br />AO5 Rough grade 12.5 acres within LTS parcel 33 GRADER 1 3.49 $547.00 <br />AO6 Final grade 6.9 acres AREA 34 GRADER 1 1.92 $302.00 <br />J02 Mobilization and Demobilization of Equipment MOBILIZE 1 5.60 $4,385.00 <br />R01 Rip 12.5 ac LTS parcel 33 RIPPER 1 14.02 $7,258.00 <br /> <br /> <br /> <br />SUBTOTALS: <br /> <br /> <br />25.03 <br /> <br />$12,492 <br /> <br /> <br />INDIRECT COSTS OVERHEAD AND PROFIT: Liability insurance: 2.02 Total = $252.34 <br />Performance bond: 1.05 Total = $131.17 <br />Job superintendent: 6.11 Total = $446.34 <br />Profit: 10.00 Total = $1,249.20 <br /> TOTAL O & P = $2,079.05 <br /> CONTRACT AMOUNT (direct + O & P) = $14,571.05 <br /> <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: Financial warranty processing (legal/related costs): 500.00 Total = 500.00 <br />Engineering work and/or contract/bid preparation: 4.25 Total = $619.27 <br />Reclamation management and/or administration: 5.00 $728.55 <br /> <br />CONTINGENCY: 0.00 Total = $0.00 <br /> <br />TOTAL INDIRECT COST = $3,926.87 <br /> <br />TOTAL BOND AMOUNT (direct + indirect) = $16,418.87 <br /> <br /> <br /> <br />MOTOR GRADER WORK <br /> <br />Task description: Rough grade 12.5 acres within LTS parcel 33 Site: Keenesburg Strip Mine Permit Action: SL9 Permit/Job#: C1981028 <br /> <br /> <br />