Laserfiche WebLink
Ms.Megan Sullivan <br /> June 6,2017 <br /> Page 2 of 2 <br /> A map depicting the proposed strategy for management of groundwater pumped from Cell 4 during <br /> dewatering operations is presented in the attached Figure 1. <br /> Please replace Tables 2 and 12 in the renewal request with the attached amended tables.The tables <br /> were amended to include evaporative losses from the approximately 2-acre infiltration basin adjacent to <br /> the northeast corner of Cell 4.As shown in the amended Table 12,the total GMR replacement <br /> obligation increased from 52.73 acre feet to 54.00 acre feet,which is still within the amount of water <br /> available through the existing GMR water service contract(60.63 acre feet). <br /> If you have any questions or need additional information,please contact me at <br /> bmemll(a«esternwaterandland.com or(970)242-0170. <br /> Sincerely, <br /> Western Water&Land,Inc. <br /> William G.Merrill <br /> Principal Hydrogeologist <br /> Cc: Jon Mueller(Kilgore Companies) <br /> John Ohara(Peak Materials) <br /> Raul Passerini,P.E.(Resource Engineering,Inc.) <br /> Attachments <br />