My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-09-05_PERMIT FILE - M1978271 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M1978271
>
2018-09-05_PERMIT FILE - M1978271 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2025 3:46:18 AM
Creation date
9/5/2018 3:46:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978271
IBM Index Class Name
Permit File
Doc Date
9/5/2018
Doc Name
Adequacy Review
From
Greg Lewicki & Associates
To
DRMS
Email Name
LJW
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
slopes resultant of the dozer push-down mining style. Additional calculations for the storm <br /> water/sediment settling pond is presented in Exhibit G - Water Infonnation. <br /> 4. Topsoil and Overburden Handling <br /> Variable topsoil thicknesses ranges from 0 to localized 18 inch thick zones, 2.5 inches is the <br /> anticipated average for the site dominant topsoil profile of 0-5 inches. An average to maximum <br /> of 4 feet of overburden can be found on site; however, some areas have no discernable <br /> overburden. Both topsoil and overburden are used on site for reclamation of mined out areas. In <br /> the event that the Garrett Pit needs to store topsoil, overburden, or waste fines in a berm, material <br /> piles will be either within the foot print of the current pit or along the perimeter edges of the site. <br /> Topsoil stockpiles will be constructed to 2H:1 V slopes and overburden piles will have 0.5H:1 V <br /> slopes; all stockpiles heights will be < 10 feet. To prevent erosion of stockpiles, within 180 days <br /> of establishment piles will be seeded with yellow sweet clover. <br /> The anticipated topsoil to be removed and stockpiled in undisturbed future mining areas amounts <br /> to 170,400 CY. Partially vegetated berms of overburden and waste fines exists in the western <br /> edges of the northern and southern perimeters of the current site. These berms contains 10 CY. <br /> The anticipated overburden in all unmined areas to be removed and stockpiled beneath the <br /> topsoil discussed prior totals to 3,278,300 CY. These are estimates based on the soils report and <br /> existing operations as of November 2017. <br /> 5. Schedule of Operations <br /> Mining operations will occur Monday through Saturday during daylight hours and intermittently <br /> during the life of the operation. Mining, screening and processing will be conducted with <br /> portable equipment at various times of the year. Product will be sold throughout the year, <br /> although little is expected to be sold in winter months. Night gravel mining will not occur; <br /> although minor truck activity or repairs may occur after daylight hours. Mining and processing <br /> will take place no more than 12 hours per day, during daylight hours. Monday through Saturday. <br /> Hauling will take place from 7 am to 7 pm Monday through Saturday. <br /> 6. Conejos County Impacts and Environmental Impacts <br /> Garrett Pit Greg UwicW and Axociatm MIX <br /> September 2018 D-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.