My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-09-04_REVISION - C1980007 (12)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980007
>
2018-09-04_REVISION - C1980007 (12)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2018 6:33:19 AM
Creation date
9/4/2018 1:13:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
9/4/2018
Doc Name Note
Reclamation Cost Estimate
From
DRMS
To
Kathy Welt
Type & Sequence
PR15
Email Name
LDS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 34 <br /> <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br /> <br />Task description: Pads and roads SS1-1 through -11: regrade <br />Site: West Elk Mine Permit Action: Pr15 Permit/Job#: C1980007 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 01B State: Colorado Abbreviation: None <br />Date: 8/27/2018 County: Gunnison Filename: C007-01b <br />User: LDS <br />Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D8T - 8SU <br />Horsepower: 310 <br />Blade Type: Semi-Universal <br />Attachment: NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br /> Utilization % <br />Ownership Cost/Hour: $93.62 NA <br />Operating Cost/Hour: $73.35 100 <br />Ripper own. <br />Cost/Hour: $0.00 NA <br />Ripper op. Cost/Hour: $0.00 100 <br />Operator Cost/Hour: $41.52 NA <br />Total unit Cost/Hour: $208.49 <br />Total Fleet Cost/Hour: $208.49 <br /> <br />MATERIAL QUANTITIES <br />Initial Volume: 31,775 <br />Swell factor: 1.125 <br />Loose volume: 35,747 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell <br />factor: <br />Cat Handbook <br /> <br />HOURLY PRODUCTION <br />Average push distance: 125 feet <br />Unadjusted hourly <br />production: <br />726.3 LCY/hr <br /> <br />Materials consistency description: Compacted fill or embankment 0.9 <br /> <br />Average push <br />gradient: <br />10 % <br />Average site altitude: 8,650 feet <br /> <br />Material weight: 2,650 lbs/LCY <br /> <br />Weight description: Decomposed rock - 25% Rock, 75% Earth
The URL can be used to link to this page
Your browser does not support the video tag.