My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-09-04_REVISION - C1980007 (12)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980007
>
2018-09-04_REVISION - C1980007 (12)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2018 6:33:19 AM
Creation date
9/4/2018 1:13:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
9/4/2018
Doc Name Note
Reclamation Cost Estimate
From
DRMS
To
Kathy Welt
Type & Sequence
PR15
Email Name
LDS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 34 <br /> <br />CIRCES Cost Estimating Software <br />BOREHOLE SEALING WORK <br /> <br />Task description: SS1 MVBs: plug and seal <br />Site: West Elk Mine Permit Action: Pr15 Permit/Job#: C1980007 <br /> <br />PROJECT IDENTIFICATION <br /> <br />Task <br />#: <br />01A State: Colorado Abbreviation: None <br />Date: 8/27/2018 County: Gunnison Filename: C007-01a <br />User: LDS <br />Agency or organization name: DRMS <br /> <br />UNIT COSTS <br /> <br />Borehole <br />Description <br />Sealing/Item <br />Method <br /> <br />Diameter <br /> <br />Length <br /> <br />Quantity <br /> <br />Unit <br /> <br />Unit <br />Cost <br /> <br />Total Cost <br />Bottom Plug PVC plug - 10 in. <br />diameter borehole <br />9" NA 11.00 EA $108.49 $1,193.39 <br />Fill 9 5/8" <br />inner casing <br />with concrete <br />to depth of <br />10' <br />Portland cement <br />grout ( Bag, material <br />cost only...94 lb. bag) <br />10" 110 30.00 bag $13.80 $414.00 <br />Cut 14" outer <br />casing at <br />Surface <br />Exposed casing <br />removal - Calculate <br />Circumference in <br />Linear Feet <br />14" NA 40.30 LF $1.83 $73.75 <br />Borehole <br />Marker <br />Borehole <br />location/identification <br />marker (EA, material <br />cost only) <br />NA NA 11.00 EA $3.67 $40.37 <br />Drill Rig <br />Time <br />SCHRAMM <br />T450WS <br />NA NA 110.00 EA $232.72 $25,599.20 <br />Water Truck <br />Time <br />Water Tanker, 2,500 <br />Gal. <br />NA NA 110.00 EA $24.48 $2,692.80 <br /> <br />Job Hours: 110.00 Total Cost: $30,014.00 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.