Laserfiche WebLink
EXHIBIT L RECLAMATION COSTS (cont) <br /> RECLAMATION COSTS <br /> 1 . Revegetation, 5 . 7 ac @ $2800 . 69/ac $15 , 963 . 93 <br /> 2 . Resoiling, 2 , 823 yd3 @ 44�/yd3 1, 242 . 12 <br /> 3 . Grading and shaping 28 . 0 ac. @ $93 . 27/ac 2 , 611 . 56 <br /> 4 . Grade and Shape mine face, 1 .9260x 1. 12 x $0.50/cy 10, 785 . 60 <br /> 5 . Topsoil pile grading, 7405 yd @$0 . 53 /yd 3 , 924 . 65 <br /> 6 . Slope maintenance, 4148 yds x 1 . 22 x $0 . 69/yd 3 , 477 . 79 <br /> 5 . Secondary revegetation 5 . 7 ac x 50% x $2800 . 69 7, 981 . 97 <br /> Net Total $45, 987 . 61 <br /> 6 . Indirect costs <br /> Mobilization 6 , 400 . 00 <br /> Insurance, Bond, & Profit 6, 010 . 58 <br /> 7 . Administration costs 4 , 253 . 85 <br /> TOTAL ESTIMATE $62 , 652 . 05 <br /> RECOMMEND BOND BE SET AT$62,700.00 <br />