Laserfiche WebLink
.Co <br /> S. COLORADO DIVISION OF RECLAMATION, MINING TY <br /> *, tEIVED <br /> *� * 1313 Sherman Street,Room 215,Denver,Colorado 80203 ph(303)866-3567 ■�► <br /> ��876�' <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET AUG 28 2018 <br /> DIVISION OF RECLAMATION <br /> File No.: M- 1983-102 Site Name: Thompson Resource MININGAND SA- -- <br /> County Grand (DRMS Use only e'; <br /> _�WM <br /> ow <br /> Permittee: Reclamation Ridge, LLC. N 3 <br /> —TR03 ins <br /> Operator(If Other than Permittee): 0 <br /> 0 <br /> O <br /> Permittee Representative: Ken Evans <br /> C <br /> Please provide a brief description of the proposed revision: <br /> This is a request for a bond reduction to implementing the approved reclamation plan to allow for <br /> aradinq of the mine floor area wotbnl it hnnrionci for ri-soffinc <br /> an explanation of the change, a map showing the area to be graded and a bond calculation worksheet. -9 <br /> s c) <br /> As defined by the Minerals Rules, a Technical Revision (TR) is: "a change in the permit or application -g <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted 1;�w <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type- Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted(mark only one) <br /> 110c, 111, 112 construction ❑ <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 ❑ <br /> 110d, 112d(l, 2 or 3) $1006 ❑ <br />