My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-08-27_PERMIT FILE - M2001056
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2001056
>
2018-08-27_PERMIT FILE - M2001056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 6:02:22 PM
Creation date
8/27/2018 4:16:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001056
IBM Index Class Name
PERMIT FILE
Doc Date
8/27/2018
Doc Name
Adequacy Review Response
From
RPM, Inc.
To
DRMS
Type & Sequence
CN1
Email Name
PSH
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wildlife use during active mining is not anticipated. Regardless,the Operator will consider <br /> the safety and protection of any wildlife entering the site during mining and reclamation <br /> operations. Finally,no described critical periods or species of concern are known by <br /> Applicant/Operator/Landowner. <br /> (2) Creation of wildlife habitat and management: <br /> The reclamation plan anticipates returning the site to rangeland. However, returning the <br /> site to rangeland will continue to make the site available for wildlife use, as it has in the <br /> past. Wildlife is opportunistic and will use what is available for food and cover. <br /> In addition, a wildlife statement will be sent to the Colorado Division of Parks and Wildlife <br /> for comment. <br /> 3.1.9 Topsoil salvage,storage and replacement: <br /> (1) Protection of topsoil: <br /> Topsoil necessary for site reclamation will be removed and placed in stockpiles prior to <br /> mining and removal of any overburden. Topsoil stockpiles will be out of drainageways, <br /> and away from active mining areas. As stated above,where topsoil stockpiles will not be <br /> disturbed for at least 180 days,the topsoil stockpiles will be seeded with the approved <br /> topsoil pile seed mix. <br /> (2) Wood vegetation shall be removed: <br /> The site is a grassland community with little or no woody vegetation. <br /> (3) Storage,location,configuration of topsoil stockpiles for control of erosion <br /> and protection from mining operations: <br /> Control of topsoil stockpiles from erosion and protection from mining operations are <br /> addressed in Section 3.1.9(1). The Pre-mine/Mine Plan Map shows the location of topsoil <br /> stockpiles,away from drainageways and separated to the extent possible from mining <br /> operations. <br /> We estimate the topsoil piles,to be located in the current mining area(please see the Pre- <br /> mine/Mine Plan Map for locations),will contain approximately 24,200 cubic yards of <br /> topsoil. This amount should be adequate for site reclamation in order to replace 6-8 inches <br /> of topsoil. Topsoil piles will move with the mining operation as subsequent phases and <br /> sections are opened. Topsoil piles will always be placed adjacent to active mining <br /> operations, allowing for easy access for reclaiming a phase which has been mined and <br /> ready for reclamation <br /> 32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.