Laserfiche WebLink
Mr. Jared Ebert, Division of Reclamation, Mining and Safety <br /> AGGREGATE <br /> August 17, 2018 <br /> INDUSTRIES <br /> Page Two <br /> Importation is expected to continue for a minimum of five(5)years after commencing the <br /> backfilling operations. <br /> (e) The imported material will be temporarily stockpiled in upland areas west of the fill <br /> area and will be backfilled and graded in accordance with the approved reclamation plan, to <br /> eliminate exposure of groundwater. <br /> (f) The area to receive the imported material for backfill is already incorporated into the <br /> post-mining configuration and will be placed in accordance with TR-05,which approved <br /> additional backfilling and grading to reduce groundwater exposure to 0.5 acre or less within <br /> the parcel of land depicted on the enclosed map. <br /> (g) The material will be placed and stabilized with the upland seed mix in accordance <br /> with the approved reclamation plan as set forth in TR-05. <br /> If you have any questions regarding this notice please contact me at (970) 396-5252 or at <br /> connie.davisLagy,reaate-us.com. <br /> Very truly yours, <br /> Connie N. Davis <br /> Land Manager <br /> Enclosures <br />