My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-08-20_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2018-08-20_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2018 1:14:02 PM
Creation date
8/21/2018 10:57:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
8/20/2018
Doc Name Note
Adequacy Letter & Cost Estimate
Doc Name
Adequacy Review
From
DRMS
To
Colowyo Coal Company LP
Type & Sequence
TR121
Email Name
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cost Summary Worksheet Cont'd Task # 000 <br />BULLDOZER WORK <br />Page 3 of 7 <br />Task description: Regrade Topsoil for TR -121 <br />Site: Colowyo Coal Mine Permit Action: 000 Permit/Job#: C1981019 <br />PROJECT IDENTIFICATION <br />Task #: 002 State: Colorado <br />Date: 6/26/2018 County: Moffat <br />User: ZTT <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat DI IT - I IU <br />Horsepower: <br />850 <br />Blade Type: <br />Universal <br />Attachment: <br />1 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper own. <br />Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />Abbreviation: None <br />Filename: C019-002 <br />$242.84 <br />Utilization % <br />NA <br />$200.83 <br />100 <br />$24.60 <br />NA <br />$13.03 <br />100 <br />$41.52 <br />NA <br />$522.81 <br />$522.81 <br />MATERIAL QUANTITIES <br />Initial Volume: 25,000 <br />Swell factor: 1.000 <br />Loose volume: 25,000 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />100 feet <br />2,870.3 LCY/hr <br />Materials consistency description: Loose stockpile 1.2 <br />Average push <br />gradient: <br />Average site altitude: <br />Material weight: <br />0% <br />7,600 feet <br />2,550 lbs/LCY <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.