My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-08-20_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2018-08-20_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2018 1:14:02 PM
Creation date
8/21/2018 10:57:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
8/20/2018
Doc Name Note
Adequacy Letter & Cost Estimate
Doc Name
Adequacy Review
From
DRMS
To
Colowyo Coal Company LP
Type & Sequence
TR121
Email Name
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cost Summary Worksheet Cont'd Task # 000 Page 2 of 7 <br />DEMOLITION WORK <br />Task description: Demolish Task Associated w/TR-121 <br />Site: Colowyo Coal Mine Permit Action: TR121 <br />PROJECT IDENTIFICATION <br />Task 001 State: Colorado <br />Date: 8/10/2018 County: Moffat <br />User: ZTT <br />Agency or organization name: DRMS <br />UNIT COSTS <br />95.50% <br />Permit/Job#: C1981019 <br />Abbreviation: None <br />Filename: C019-001 <br />Location adiustment: <br />Structure or <br />Item <br />Dimensions <br />Demolition Menu <br />Quantity <br />Unit <br />Unit <br />Total Cost <br />Description <br />Selection <br />Cost <br />Communication <br />8'x 10'x <br />Bldg. (SN) <br />960.00 <br />CF <br />$0.19 <br />$180.48 <br />Building - <br />12' <br />demo./on-site <br />Collom <br />disposal in existing <br />Substation <br />pit or cut - Max. <br />10,000 ft. haul <br />Communication <br />8'x 10'x <br />Bldg. (SN) <br />960.00 <br />CF <br />$0.19 <br />$180.48 <br />Building - <br />12' <br />demo./on-site <br />Security Area <br />disposal in existing <br />pit or cut - Max. <br />10,000 ft. haul <br />Main <br />100' <br />Powerline or utility <br />3.00 <br />EA <br />$1,701.00 <br />$5,103.00 <br />Communication <br />line - Structural <br />Tower <br />Steel Box Type <br />Frame Structure <br />Dismantle and <br />Dispose <br />Main <br />25 CY <br />Demo. and on-site <br />4.00 <br />LF <br />$10.62 <br />$42.48 <br />Communication <br />disposal in <br />Tower Pad <br />excavated pit, 2.0 <br />ft. x 3 ft. - Max. 50 <br />ft. push <br />Metoeorological <br />30' <br />Powerline or utility <br />1.00 <br />EA <br />$1,701.00 <br />$1,701.00 <br />Station <br />line - Structural <br />Steel Box Type <br />Frame Structure <br />Dismantle and <br />Dispose <br />Metoeorological <br />4 CY <br />Demo. and on-site <br />2.00 <br />LF <br />$3.38 <br />$6.76 <br />Station Pad <br />disposal in existing <br />pit, 1.0 ft. x 2 ft. - <br />Max. 50 ft. push <br />Remove Power <br />16,897' <br />OBSOLETE- <br />16,897.00 <br />LF <br />$0.09 <br />$1,520.73 <br />Lines <br />Powerline or utility <br />line, line disposal <br />only <br />Total Cost <br />Subtotal (adjusted for <br />Job Hours: 40.00 (unadjusted): $8,734.93 location): $8,341.86 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.