Laserfiche WebLink
Ouray Silver Mines Inc. <br /> Technical Revision 10 August 14, 2018 <br /> is expected to remain in place. Associated structures that are not required for function after <br /> closure will be removed and the area reclaimed in a manner consistent with the existing permit. <br /> 7.2 Groundwater Monitoring Well Installation <br /> Following closure and completion of post closure monitoring requirements the monitoring well <br /> will be plugged and sealed, and an abandonment report will be filed with the State Engineer. <br /> 7.3 Diesel Tank Relocation <br /> The Diesel tank will be removed from site upon closure. <br /> 6 <br />