Laserfiche WebLink
May 2018 C-1981-010/Trapper Mine RAR <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 8 <br />Number of Complete Inspections this Fiscal Year: 4 <br /> <br /> Page 3 of 8 <br /> <br /> <br /> <br />ROADS- Rule 4.03 <br />Construction 4.03.1(3) I 4.03.2(3); Drainage 4.03.1(4) I 4.03.2(4); Surfacing and <br />Maintenance 4.03.1(5) and (6) I 4.03.2(5) and (6); Reclamation 4.03.1(7) I 4.03.2(7) <br />o Haul roads and access roads were dry and passable, free of ruts and appeared <br />well maintained providing access to all areas of the site . <br />o No evidence of offsite impacts were observed. <br /> <br />SUPPORT FACILITIES – Rule 4.04 <br />o Support facilit ies, equipment storage and silo areas were visited. No issues <br />were noted at time of inspection. <br /> <br />HYDROLOGIC BALANCE- Rule 4.05 <br />Drainage Control 4.05.1, 4.05.2, 4.05.3; Siltation Structures 4.05.5, 4.05.6; Discharge <br />Structures 4.05.7, 4.05.10; Diversions 4.05.4; Effluent Limits 4.05.2; Ground Water <br />Monitoring 4.05.13; Surface Water Monitoring 4.05.13; Drainage- Acid and Toxic <br />Materials 4.05.8; Impoundments 4.05.6, 4.05.9; Stream Buffer Zones 4.05.18 <br />The pond systems observed included Middle Flume 3, and the Pyeatt’s. <br />o Unless noted, pond banks appeared stable and well vegetated. <br />o Dredging operations have been ongoing at Middle Flume Pond, photo #3 . <br />o Middle Flume dozer basin had been repaired and was holding water. <br /> <br />Pond Table <br />Pond Name May 2018 Comments <br /> <br />W/DQ = Holding <br />water/Discharging Pond Maintenance Items in green <br /> <br />Middle Flume #3 DQ Pond being dredged <br />Middle Pyeatt #1 D Spillway clear and in good repair <br />Middle Pyeatt #2 D Spillway clear and in good repair <br />Middle Pyeatt #1 D Spillway clear and in good repair <br />East Pyeatt #1 DQ Clear, No issues noted <br />East Pyeatt #2 DQ Clear, No issues noted <br />East Pyeatt #3 W No issues noted <br />