Laserfiche WebLink
26. If this permit specifically states that final approval has been granted, then the remainder of <br />this condition is not applicable. Otherwise, the issuance of this construction permit is <br />considered initial approval and does not provide "final" approval for this activity or operation of <br />this source. Final approval of the permit must be secured from the APCD in writing in <br />accordance with the provisions of 25-7-114.5(12)(a) C.R.S. and AQCC Regulation Number 3, <br />Part B, III.G. Final approval cannot be granted until the operation or activity commences and <br />has been verified by the APCD as conforming in all respects with the conditions of the permit. <br />Once self -certification of all points has been reviewed and approved by the Division, it will <br />provide written documentation of such final approval. Details for obtaining final approval to <br />operate are located in the Requirements to Self -Certify for Final Approval section of this <br />permit. The operator must retain the permit final approval letter issued by the Division after <br />completion of self -certification with the most current construction permit. <br />27. This permit is issued in reliance upon the accuracy and completeness of information supplied <br />by the applicant and is conditioned upon conduct of the activity, or construction, installation <br />and operation of the source, in accordance with this information and with representations <br />made by the applicant or applicant's agents. It is valid only for the equipment and operations <br />or activity(ies) specifically identified in this permit. If subsequent operations or testing at the <br />source indicate the information supplied to obtain this permit and relied upon in the creation <br />and issuance of this permit is inaccurate, the source must submit an application to modify the <br />permit to address the inaccuracy(ies). (Reference: Regulation Number 3, Part B III.E.) <br />By: Y• B **9z$__ FOR: <br />Jonathan Brickey <br />Permit Engineer <br />Permit History <br />R K Hancock III, P.E. <br />Construction Permits Unit Supervisor <br />Issuance <br />Date <br />Description <br />Issuance #1 <br />This issuance <br />Issued to Colowyo Coal Company, L.P. <br />Notes to Permit Holder (as of date of permit issuance): <br />1) The production or raw material processing limits and emission limits contained in this permit <br />are based on the production/processing rates requested in the permit application. These limits <br />may be revised upon request of the permittee providing there is no exceedence of any specific <br />emission control regulation or any ambient air quality standard. A revised air pollutant emission <br />notice (APEN) and application form must be submitted with a request for a permit revision. <br />(Reference: Regulation Number 3, Part B II.A.4. ) <br />2) This source is subject to the Common Provisions Regulation Part II, Subpart E, Affirmative <br />Defense Provision for Excess Emissions During Malfunctions. The permittee must notify the <br />Division of any malfunction condition which causes a violation of any emission limit or limits <br />stated in this permit as soon as possible, but no later than noon of the next working day, <br />followed by written notice to the Division addressing all of the criteria set forth in Part II.E.1. <br />of the Common Provisions Regulation. See: https://www.colorado.Qov/pacific/cdphe/agcc- <br />re s. <br />3) The emission levels contained in this permit are based on emission factors as referenced in <br />Attachment A. <br />e® COLORADO <br />Air Pollution Control Division <br />--11-11-, Page 11 of 17 <br />