Laserfiche WebLink
GEOTECHNICAL STABILITY EXHIBIT (CONT) Page 2 <br /> August 10, 2018 <br /> the irrigation return flow ditch along the northeast part of the <br /> mine . I also point out here that along the entire south side <br /> none of the structures are located within 200 feet of the mining <br /> face except along the narrow band where the peninsula will be <br /> removed and in this area the slope will be mined 3h to iv. <br /> The information is presented based on the cross sections <br /> shown in this report and using the distances from them to deter- <br /> mine the safety factors from the proposed mining face closest to <br /> the structure . The location of the cross sections are shown on <br /> Map Exhibit C-2 - Mining Plan Map (option 2) . <br /> SECTION A - MEMEDA CHAINLINK FENCE - SAFETY FACTOR 10 . 5 - Is <br /> located in the southwest part of the permit area across the old <br /> Plant site area . The floor of the lake in that area will be <br /> approximately 4120 and the base of the fence is approximately <br /> 4145 . The top of the working face will be approximately 25 feet <br /> below and 375 feet north of the chainlink fence . Reclaimed slope <br /> SF = 11 . 1 <br /> SECTION B - MEMEDA TO PENINSULA SETBACK - SAFETY FACTOR 7 . 9 <br /> - Is located on the south side where the peninsula that divides <br /> the two lakes will be mined. The floor of the lake in that area <br /> will be approximately 4120 and the base of the fence is approxi- <br /> mately 4145 . The top of the mine face will be approximately 25 <br /> feet below and 248 feet northeast of the chainlink fence and the <br /> slope will be mined 3h to lv. <br /> SECTION C - SOUTH LINE CLOSEST STRUCTURE TO MINING - SAFETY <br /> FACTOR 5 . 8 - Is located on the south side where the peninsula <br /> that divides the two lakes will be mined. The floor of the lake <br /> in that area will be approximately 4120 and the base of the power <br /> pole is approximately 4145 . The top of the mine face will be <br /> approximately 25 feet below and 172 feet north of the power pole <br /> and the slope will be mined 3h to iv. <br /> SECTION D - LYTLE BUILDING TO PENINSULA SETBACK - SAFETY <br /> FACTOR 5 . 8 - Is located on the south side where the peninsula <br /> that divides the two lakes will be mined. The floor of the lake <br /> in that area will be approximately 4120 and the base of the <br /> building is approximately 4150 . The top of the mine face will be <br /> approximately 30 feet below and 167 feet north of the building <br /> and the slope will be mined 3h to iv. <br /> SECTION E - HANSEN BUILDING TO PENINSULA SETBACK - SAFETY <br /> FACTOR 4 .2 - Is located on the south side where the peninsula <br /> that divides the two lakes will be mined. The floor of the lake <br />