Laserfiche WebLink
MINING PLAN EXHIBIT D(CONT) <br /> MINING TIMETABLE <br /> The continuing uncertainty of economic conditions in the con- <br /> struction materials industry and personal needs preclude an <br /> accurate forecast of demand during the life of the mine . This <br /> estimated mining timetable is based on an average year and it is <br /> expected that a specific year will vary widely from the average . <br /> In most cases the stockpile areas cover the gravel that will be <br /> mined so the acres of each are nearly the same . The maximum <br /> total area to be mined is 19 . 43 acres + . <br /> MINING TIMETABLE <br /> ACRES ± AVERAGE <br /> MINING YEARS ANNUAL <br /> AREA TOTAL MINED LAKE SETBACKS PLANT PRODUCTION <br /> AREA AREA AREA UNDIS- SITE & TONS/YEAR <br /> TURBED ROADS <br /> AREA <br /> OPTION 1 30-37 38.35 19.43 29.03 4 .17 5.15 20, 000 <br /> OPTION 2 8-10 38.35 11.05 21.12 11.74 4.49 20, 000 <br /> 11 a (revised 8/10/2018) <br />