My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-07-02_PERMIT FILE - C2010089 (16)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2010089
>
2018-07-02_PERMIT FILE - C2010089 (16)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2018 10:05:12 AM
Creation date
8/9/2018 9:59:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
PERMIT FILE
Doc Date
7/2/2018
Doc Name
Hydrologic Reclamation Plan
Section_Exhibit Name
Section 2.05.6(3)(b)(v)
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HYDROLOGIC RECLAMATION PLAN <br />INTRODUCTION <br />The hydrologic reclamation plan for the NHN permit area is presented in two parts. The first part <br />focuses on specific practices which are conducted to minimize the impact of mining on the <br />hydrologic balance within and adjacent to the permit boundary. The second part addresses those <br />impacts that may occur regardless of these practices. The emphasis of the second part is on the <br />monitoring of the extent and magnitude of mining impacts. Where possible, reference has been <br />made to those sections which contain details regarding certain practices. <br />PRACTICES EMPLOYED TO MINIMIZE THE IMPACTS OF MINING ON THE <br />HYDROLOGIC SYSTEM <br />Ground Water Ouality The mining practices that involve replacement of spoil material into <br />mine pits are detailed in Section 2.05.4(2)(c) Backfilling and Grading. Topsoil and overburden <br />handling plans are detailed in Section 2.05.4(2)(d) Overburden and Topsoil Handling. An <br />extensive analysis of the spoil water quality and quantity was done for the bond release of New <br />Horizon #1 area in the year 2000. Based on years of monitor hole data and spoil spring data, it <br />was shown that although pyrite oxidation would slightly increase the Total Dissolved Solids <br />(TDS) of the water emanating from the spoil, the levels of increased TDS and pH were low <br />enough that when mixed with Tuttle Draw and the San Miguel River, the increases were <br />negligible. It was found that the increases were expected for a considerably long period of time, <br />probably from 400 to 1500 years. After this amount of time, the pyrite will be fully oxidized and <br />the ground water quality will be back to background levels, which is still high in TDS. Because <br />of the findings on negligible impacts to water quality, no special handling of materials is <br />anticipated for mining operations conducted. The method of mining by removing the weathered, <br />oxidized, free dig material separately from the unweathered bedrock and then covering the <br />unweathered overburden with the weathered oxidized free dig material is done routinely to aid <br />the mining operation and is not considered "special handling". The practices of dilution of any <br />unsuitable overburden and burial have worked to date at the adjacent New Horizon Mine. <br />Selective handling would only be used if some unforeseen overburden zone is much worse than <br />any encountered to date. In this case, it would be buried deeper in the backfill spoil than what <br />would occur in the normal overburden mixing. Each exploration hole, other drill or borehole, <br />well, or other exposed underground opening except those used solely for surface blasting will be <br />plugged or sealed to prevent acid or toxic drainage from entering the ground water, minimize <br />disturbance to the prevailing hydrologic balance, and ensure safety. Any holes, wells or other <br />exposed underground opening that will be temporarily inactive but eventually used for mining <br />related purposes will be temporarily sealed at the surface and secured and protected for safety by <br />surface structures or barricades. <br />Section 2.05.6(3)(b)(v) Page 1 March 2018 (TR -16) <br />
The URL can be used to link to this page
Your browser does not support the video tag.