Laserfiche WebLink
Table 2.05.3-1 <br />Major Mining Equipment <br />Primary Excavation Equipment <br />Equipment Type <br />Quantity <br />Capacity <br />Hydraulic Shovel <br />1 <br />20 cubic yards <br />End Dump Truck <br />4 <br />100 tons <br />Crawler Tractor <br />2 <br />400 horsepower <br />Crawler Tractor <br />1 <br />770 horsepower <br />Major Support Equipment <br />Equipment Type <br />Quantity <br />Capacity <br />Overburden Drill <br />1 <br />6-3/4" diameter <br />Wheel Loader <br />1 <br />7 cubic yards <br />Wheel Loader <br />1 <br />17 cubic yards <br />Motor Grader <br />1 <br />200 horsepower <br />Water Truck <br />1 <br />9,000 gallons <br />Table 2.05.3-2 <br />Mining Operation Statistics <br />Year <br />Disturbed <br />Acres <br />Coal Tons <br />OB/Parting <br />Cubic Yards <br />Stripping Ratio <br />2013-2017 <br />195.8 <br />1,323,044 <br />11,748,520 <br />8.88:1 <br />TOTAL <br />195.8 <br />1,323,044 <br />11,748,520 <br />8.88:1 <br />Table 2.05.3-3 <br />Approximate Timing of Operations <br />Item <br />Description <br />Date <br />1 <br />Relocate 2nd Park Lateral to pipeline <br />2011 <br />2 <br />Construct Surface Facilities; Extend or Relocate Utilities <br />2012-2013 <br />3 <br />Complete mining at NH2; Move Equipment to NHN <br />2013 <br />4 <br />Mine NHN Area <br />2013-2017 <br />5 <br />Relocate 2nd Park Pipeline to Final Postmining Location <br />2017-2018 <br />6 <br />Topsoil and revegetate final pit area <br />2018-2019 <br />7 <br />Continue to irrigate & monitor reclaimed areas until final bond release <br />2019-2029 <br />Section 2.05.3 Page 4 March 2018 (TR -16) <br />