My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-08-06_GENERAL DOCUMENTS - C1981019
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981019
>
2018-08-06_GENERAL DOCUMENTS - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2018 9:22:45 AM
Creation date
8/7/2018 9:10:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
General Documents
Doc Date
8/6/2018
Doc Name Note
Revised
From
DRMS
To
Colowyo Coal Company
Type & Sequence
RN7
Permit Index Doc Type
Findings
Email Name
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MR -182 MR -182 incorporated a new raw water pipeline from the main water tank to a water <br />horse location east of the tank. <br />MR -183 MR -183 incorporated Exhibit 5, Item 9 to the PAP which contains the final cultural <br />resource discovery report for all the sites that were discovered during operations in <br />2017 for the Collom expansion. <br />MR -184 MR -184 incorporated discussions concerning the expansion of the Axial Basin <br />Substation within the permit boundary. <br />MR -185 MR -185 incorporated fifteen power poles within or adjacent to the Collom facilities <br />area. <br />MR -186 MR -186 incorporated an in -pit drilling program within the Collom Pit. <br />MR -187 MR -187 consolidated all of Colowyo's annual reclamation and hydrology report <br />rule requirements and permit commitments into Section 2.04.13 in Volume 1 of the <br />PAP. <br />3.5 Status of Violations <br />No Notices of Violations (NOVs) have been issued since approval of Permit Renewal No. 6. <br />3.6 Applicant/Violator System <br />Applicant/Violator System (AVS) checks were completed on January 24, 2018 and June 28, 2018. <br />Another check will be made after the proposed decision and before issuance of the permit. <br />3.7 Proposed Decision Date <br />A Decision date of July 9, 2018 on the renewal application is based on this findings document. <br />3.8 Public Notification of Proposed Approval and Issuance of the Revision <br />Notice of the Proposed Decision will be published once a week for two consecutive weeks in the <br />Craig Daily Press and Rio Blanco Herald Times (Rule 2.07.4(2)(d)). Notification letters of the <br />Decision will be sent to: Colowyo (Rules 2.07.4(2)(c) and 2.08.5(3)(b)); OSM, Western Regional <br />Coordinating Center (Rules 2.07.4(2)(c) and 2.08.5(3)(b)); the Office of Archaeology & Historic <br />Preservation; the surface and mineral owners of record of the affected land (BLM and the State <br />Board of Land Commissioners); and to the Moffat and Rio Blanco County Commissioners (Rule <br />2.08.5(3)(b)). <br />If no objections are received within 30 days of the first publication (Rule 2.07.4(3)(a)), and with <br />Revised Proposed Decision and Findings of Compliance August 2018 <br />Permit Renewal No. 7 P a g c 112 <br />
The URL can be used to link to this page
Your browser does not support the video tag.