My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-08-06_GENERAL DOCUMENTS - C1981019
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981019
>
2018-08-06_GENERAL DOCUMENTS - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2018 9:22:45 AM
Creation date
8/7/2018 9:10:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
General Documents
Doc Date
8/6/2018
Doc Name Note
Revised
From
DRMS
To
Colowyo Coal Company
Type & Sequence
RN7
Permit Index Doc Type
Findings
Email Name
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MR -168 MR -168 incorporated a small building at the current facilities area to add additional <br />room for administration services at the mine. <br />MR -169 MR -169 incorporated four geotechnical drill holes adjacent to Wilson Reservoir <br />and State Highway 13. <br />MR -170 MR -170 incorporated a short description of non -mining related disturbances that <br />will occur within the permit boundary. <br />MR -171 MR -171 revised locations of several topsoil windrows at the Jubb Creek temporary <br />facilities area to ensure they are within the primary sediment control that will be <br />constructed within the facility area. <br />MR -172 MR -172 revised the footprint of topsoil stockpile 25A to allow closer access to the <br />stockpile from the Collom Haul Road and to increase the overall footprint to ensure <br />sufficient room is available to stockpile topsoil for the life of the Collom operation. <br />MR -173 MR -173 incorporated a new topsoil stockpile location (21F) and revised one topsoil <br />location previously denoted as Windrows 7 to topsoil pile 21D. <br />MR -174 MR -174 incorporated an in -pit drilling program within the Collom Pit box cut. <br />MR -175 MR -175 incorporated discussion in Section 4.12 of Volume 1 of the PAP <br />concerning non -mining related ranch roads within the permit boundary. <br />MR -176 MR -176 incorporated information concerning a power line alignment to the Collom <br />facilities area. <br />MR -177 MR -177 incorporated a topsoil depth testing program to define the overall topsoil <br />depths that will be encountered within the footprint of the temporary out of pit spoil <br />pile at Collom. <br />MR -178 MR -178 incorporated Exhibit 5, Item 7 to the PAP which includes a cultural <br />resource discovery report and Historic Properties Treatment Plan to mitigate the <br />site included in the discovery report. <br />MR -179 MR -179 incorporated Exhibit 5 Item 8 to the PAP, which includes a cultural <br />resource discovery report and Historic Properties Treatment Plan to mitigate the <br />sites included in the discovery report. <br />MR -180 MR -180 updated the Certificate of Liability Insurance for the Colowyo Mine. <br />MR -181 MR -181 updated the mine plan timing for the South Taylor Pit. <br />Revised Proposed Decision and Findings of Compliance August 2018 <br />Permit Renewal No. 7 P a g e 111 <br />
The URL can be used to link to this page
Your browser does not support the video tag.