My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-07-23_INSPECTION - C1981041
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981041
>
2018-07-23_INSPECTION - C1981041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2018 7:39:32 AM
Creation date
7/31/2018 12:05:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Inspection
Doc Date
7/23/2018
Doc Name
Inspection Report
From
DRMS
To
Snowcap Coal Company, Inc
Inspection Date
6/27/2018
Email Name
CCW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 27, 2018 C-1981-041/Roadside Portals CCW <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 10 <br />Number of Complete Inspections this Fiscal Year: 4 <br /> <br /> Page 4 of 8 <br /> <br /> <br />TOPSOIL – Rule 4.06 <br />Redistribution 4.06.4: <br /> Of the areas inspected for Phase II and III release, the footprint for the conveyor footer was the only location <br />with a topsoil replacement requirement. The A Substation and the Light Use Road #1 were pre-law disturbances and <br />do not have a topsoil replacement requirement. The requirement outlined in the Permit for the conveyor footer <br />footprint is to place 6 inches of topsoil back on the site. During the inspection, 6 topsoil depth samples were taken <br />(Photo 13). All six of the samples yielded a depth of 6 inches of topsoil. <br /> <br /> <br /> <br />DOCUMENTS RECEIVED: None <br />OTHER (SPECIFY): All areas requested in the SL-11 bond release were in good condition based on the <br />inspection conducted. <br />The document attached to the end of this report is a returned letter sent to Mr. Fontanari via certified mail, <br />notifying Mr. Fontanari of the this bond release inspection. The letter was dated June 1, 2018. The letter was <br />returned to the Division on June 29, 2018, two days after the inspection was conducted. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.