My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-07-16_REVISION - M1998103
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1998103
>
2018-07-16_REVISION - M1998103
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 6:02:21 PM
Creation date
7/16/2018 4:47:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998103
IBM Index Class Name
REVISION
Doc Date
7/16/2018
Doc Name Note
Request for Conversion
From
Town of Limon
To
DRMS
Type & Sequence
CN1
Email Name
PSH
MAC
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(c) a signed affidavit certifying that the material is clean and inert, as defined in Rule <br /> 1.1(20); <br /> CERTIFICATION: <br /> The Town of Limon herby certifies the material to be imported to the Patty's Pit,will be clean <br /> and inert as defined in Rule 1.1. (20). <br /> Rule: 1.2.(2),states clean and inert material is any material which is, "...non-tvater— <br /> soluble anti non-putrescible solids together with such minor amounts and types of other <br /> materials, unless such materials are acid or toxic producing,as will not significantly <br /> affect the inert nature of such solids. The term includes,but is not limited to,earth,sand, <br /> gravel, rock,concrete which has been in a hardened state for at least sixty days, masonry, <br /> asphalt paving fragments, and other inert solids." <br /> Title:_ <br /> - _ - I <br /> Signature <br /> (d) the approximate dates the proposed activity will commence and end,..; <br /> Importation of inert waste materials may begin any time after the Conversion Application <br /> approval date. Importation will continue for the life of the mining operation. The importation <br /> of the inert waste materials will end prior to the end of site reclamation and the final grading- <br /> process. <br /> (e) an explanation of how the backfilled site will result in a post-mining configuration <br /> that is compatible with the approved post-mining land use; and <br /> Importation of inert waste materials will be placed in an area of the pit where the final slopes <br /> have been established. The imported,inert material will then be blended into the sloped area. <br /> creating an even less steep slope. The back filled inert material will then be covered with <br /> overburden(if necessary), topsoiled and seeded. This process will achieve the approved post <br /> ixuninsv land use, rangeland. <br /> (f) a general engineering plan stating how the material will be placed and stabilized in <br /> a manner to avoid unacceptable settling and voids. <br /> As with the placement of other loose types of soil materials, it will be compacted by several <br /> passes of large equipment, such as a dozer, wheeled loader or other similar equipment. <br /> 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.