Laserfiche WebLink
(c) a signed affidavit certifying that the material is clean and inert, as defined in Rule <br /> 1.1(20); <br /> CERTIFICATION: <br /> The Town of Limon herby certifies the material to be imported to the Patty's Pit,will be clean <br /> and inert as defined in Rule 1.1. (20). <br /> Rule: 1.2.(2),states clean and inert material is any material which is, "...non-tvater— <br /> soluble anti non-putrescible solids together with such minor amounts and types of other <br /> materials, unless such materials are acid or toxic producing,as will not significantly <br /> affect the inert nature of such solids. The term includes,but is not limited to,earth,sand, <br /> gravel, rock,concrete which has been in a hardened state for at least sixty days, masonry, <br /> asphalt paving fragments, and other inert solids." <br /> Title:_ <br /> - _ - I <br /> Signature <br /> (d) the approximate dates the proposed activity will commence and end,..; <br /> Importation of inert waste materials may begin any time after the Conversion Application <br /> approval date. Importation will continue for the life of the mining operation. The importation <br /> of the inert waste materials will end prior to the end of site reclamation and the final grading- <br /> process. <br /> (e) an explanation of how the backfilled site will result in a post-mining configuration <br /> that is compatible with the approved post-mining land use; and <br /> Importation of inert waste materials will be placed in an area of the pit where the final slopes <br /> have been established. The imported,inert material will then be blended into the sloped area. <br /> creating an even less steep slope. The back filled inert material will then be covered with <br /> overburden(if necessary), topsoiled and seeded. This process will achieve the approved post <br /> ixuninsv land use, rangeland. <br /> (f) a general engineering plan stating how the material will be placed and stabilized in <br /> a manner to avoid unacceptable settling and voids. <br /> As with the placement of other loose types of soil materials, it will be compacted by several <br /> passes of large equipment, such as a dozer, wheeled loader or other similar equipment. <br /> 30 <br />