Laserfiche WebLink
of C0 <br /> M-2004-031 TR06 <br /> " COLORA <br /> '�• COMPLIED!!!! [NG AND SAFETY <br /> * 1313 66-3567 <br /> *,876» Three Prior Violations! <br /> jle, mac D <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET <br /> 2004-031 . Hazeltine Mine JUL �??018 <br /> File No.: M- Site Name. � rt.r <br /> 'NA4 <br /> Adams Count "� <br /> County y TR# ORMS Use only)`' <br /> Permittee:Aggregate Industries - WCR, Inc. <br /> Operator(If Other than Permittee): n/a <br /> Permittee Representative: Joel Bolduc <br /> Please provide a brief description of the proposed revision: <br /> Revision to operating plan to keep the Orr Drain open 365 days per year. <br /> As defined by the Minerals Rules, a Technical Revision (TR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered "filed for review" until the appropriate fee is received by the <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 110c, 111, 112 construction ❑ <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 ❑ <br /> 110d, 112d(l, 2 or 3) $1006 ❑ <br />