Laserfiche WebLink
Daily Report ■■ <br /> VLF2 Geomembrane Recertification <br /> ' 475.0106.026 ■ <br /> July 6,2018 <br /> ' 2.3 Geomembrane Removal <br /> Comanco cut and removed the geomembrane liner using CX210C CASE Excavator between 9850' <br /> ' bench and 9900' bench. <br /> ' 3.0 NEWFIELDS ACTIVITIES <br /> NewFields personnel observed DCF placement, geomembrane removal, and anchor trench <br /> excavation during the shift. <br /> 4.0 COMMUNICATIONS AND MEETINGS <br /> ' NewFields personnel attended a project pre-shift safety meeting conducted by Ames <br /> Construction. <br /> ' If an you have questions or require additional information, please contact us at your <br /> Y Y <br /> ' convenience. <br /> Sincerely, <br /> ' NewFields Mining Design &Technical Services <br /> Prepared by: Benjamin Melly. 817.889.7315 <br /> '• � .,d <br /> ' DCF Placement <br /> 1 <br />