Laserfiche WebLink
' ■NewFields <br /> Perspective.Vision. Solutions. <br /> ' FIELD DAILY PROGRESS REPORT <br /> Client: Cripple Creek &Victor Gold Mining Company <br /> Project: VLF2 Geomembrane Recertification <br /> ' NewFields Project Number: 475.0106.026 <br /> Date: July 6, 2018 <br /> ' S M T W T F S <br /> ' Temperature: Low: 50'F to High: 69°F Weather: Mostly Cloudy <br /> ' NEWFIELDS PERSONNEL <br /> Name Hours <br /> ' Benjamin Melly 12 <br /> Alex Lewallen 8 <br /> ! 1.0 AMES CONSTRUCTION ACTIVITIES <br /> 1.1 Drain Cover Fill Placement <br /> ' A Cat D6T LGP dozer continued to push and place Drain Cover Fill (DCF) material between 9650' <br /> bench and 9735' elevation in a minimum of two-foot lift. <br /> ' 1.2 Anchor Trench Excavation <br /> ' A Cat 336F and A Cat 305.5 E mini excavator were used to complete the excavation of anchor <br /> trench on the 9900' bench. <br /> 2.0 COMANCO ACTIVITIES <br /> 2.1 Geomembrane Acceptance <br /> ' No activities during the shift <br /> ' 2.2 Geomembrane Installation <br /> No activities during the shift <br />