Laserfiche WebLink
Daily Report ■ <br /> VLF2 Geomembrane Recertification <br /> ' 475.0106.026 ■ <br /> July 3,2018 <br /> 1.3 Geomembrane Removal <br /> No activities during the shift. <br /> 2.0 COMANCO ACTIVITIES <br /> ' 2.1 Geomembrane Acceptance <br /> No activities during the shift <br /> ' 2.2 Geomembrane Installation <br /> ' The tie-in for PRC-31 to the existing geomembrane was welded using one fusion welding <br /> machine/operator combination. A total of 241 linear feet of fusion seaming was completed. All <br /> pressure testing was performed and passed. Repairs were performed using the extrusion welding <br /> ' method. A total of 75 linear feet of extrusion seaming was completed. All repairs and extrusion <br /> welded seams were not vacuum tested during the shift until tomorrow.All the destructive testing <br /> ' was performed and met project specifications. <br /> 3.0 NEWFIELDS ACTIVITIES <br /> tNewfield personnel observed DCF placement, DCF removal, anchor trench backfill, <br /> geomembrane installation during the shift. <br /> ' D 4.0 COMMUNICATIONS AN MEETINGS <br /> NewFields personnel attended a project pre-shift safety meeting conducted by Ames <br /> Construction. <br /> If you have any questions or require additional information, please contact us at your <br /> convenience. <br /> Sincerely, <br /> NewFields Mining Design &Technical Services <br /> Prepared by: Benjamin Melly. 817.889.7315 <br />