My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-07-11_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2018-07-11_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2021 5:04:26 AM
Creation date
7/12/2018 9:31:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
7/11/2018
Doc Name Note
Record of Construction Report
Doc Name
Construction Quality Assurance Report (CQA)
From
CC&V
To
DRMS
Type & Sequence
TR100
Email Name
TC1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.M. � NewF�elds <br /> Perspective. Vision. Solutions. <br /> FIELD DAILY PROGRESS REPORT <br /> Client: Cripple Creek &Victor Gold Mining Company <br /> ' Project: VLF2 Geomembrane Recertification <br /> NewFields Project Number: 475.0106.026 <br /> Date:July 3, 2018 <br /> ' S M T W T F S <br /> ' Temperature: Low: 56'F to High: 79'F Weather: Partly Cloudy <br /> ' NEWFIELDS PERSONNEL <br /> Name Hours <br /> ' Benjamin Melly 13 <br /> Alex Lewallen 12 <br /> ' 1.0 AMES CONSTRUCTION ACTIVITIES <br /> 1.1. Drain Cover Fill Placement <br /> ' A Cat D6T LGP dozer was utilized to push and place Drain Cover Fill (DCF) material between 9650' <br /> bench and 9712' elevation in a minimum of two-foot lift. <br /> ' 1.1 Drain Cover Removal <br /> ' A Cat 312C L excavator was used to remove DCF from existing Soil Liner Fill (SLF) surface and <br /> existing geomembrane on 9850' bench. <br /> 1.2 Anchor Trench Backfill <br /> The Anchor Trench was backfilled on 9850' bench using a skid steer and A CAT 312C L excavator <br /> ' equipped with vibratory plate compactor and the labor guys. The temporary anchor trench was <br /> completed with the last layer of soil liner fill according to project specification. <br />
The URL can be used to link to this page
Your browser does not support the video tag.