Laserfiche WebLink
Daily Report <br /> VLF2 Geomembrane Recertification <br /> ' 475.0106.026 ■ <br /> June 30,2018 <br /> 4.2 Geomembrane Installation <br /> All the repairs and extrusion welded seams were vacuum tested and passed. All the destructive <br /> ' testing was performed and met project specifications. <br /> ' 3.0 NEWFIELDS ACTIVITIES <br /> NewFields personnel observed DCF placement, vacuum testing and destructive sample testing <br /> tduring the shift. <br /> 4.0 COMMUNICATIONS AND MEETINGS <br /> NewFields personnel attended a project pre-shift safety meeting conducted by Ames <br /> Construction. <br /> If you have an questions or require additional information lease contact us at our <br /> Y Y q q p Y <br /> ' convenience. <br /> Sincerely, <br /> NewFields Mining Design & Technical Services <br /> Prepared by: Benjamin Melly. 817.889.7315 <br /> r <br />