Laserfiche WebLink
. NewFields <br /> Perspective. Vision, Solutions. <br /> FIELD DAILY PROGRESS REPORT <br /> Client: Cripple Creek & Victor Gold Mining Company <br /> Project: VLF2 Geomembrane Recertification <br /> ' NewFields Project Number: 475.0106.026 <br /> Date: June 30, 2018 <br /> S M T W T F S <br /> Temperature: Low: 56*F to High: 73°F Weather: Clear <br /> NEWFIELDS PERSONNEL <br /> Name Hours <br /> Benjamin Melly 9 <br /> Alex Lewallen 0 <br /> 1.0 AMES CONSTRUCTION ACTIVITIES <br /> 1.1 Drain Cover Fill Placement <br /> ' Mine Operations continued to deliver Drain Cover Fill (DCF) from the stockpile to placement area <br /> between 9650' elevation and loading area. A Cat D6T LGP dozer was used to push and placed the <br /> DCF material between 9650' bench and 9684' elevation in a minimum of two-foot lift. <br /> 1.2 Anchor Trench Excavation <br /> 2 No activities during the shift. <br /> 2.1 Geomembrane Removal <br /> 3 No activities during the shift. <br /> ' 2.0 COMANCO ACTIVITIES <br /> 4.1 Geomembrane Acceptance <br /> No activities during the shift. <br />