Daily Report . <br /> VLF2 Geomembrane Recertification ■ <br /> ' 475.0106,026 <br /> June 29,2018 <br /> ' 2.2 Geomembrane Installation <br /> The tie-in for existing geomembrane and PRC-17 was welded using one fusion welding <br /> ' machine/operator combination. A total of 240 linear feet of seam was completed. 213 linear feet <br /> of extrusion seaming was performed using one extrusion machine/operator method. Two <br /> ' destructive testing samples, RCDF-15 and RCDX-2 were marked and cut, but not tested. All <br /> pressure testing was performed and passed. Repairs were performed using the extrusion welding <br /> method for all marked defects. No vacuum testing was performed. <br /> 3.0 NEWFIELDS ACTIVITIES <br /> ' NewFields personnel observed DCF placement and geomembrane installation activities during <br /> the shift. <br /> ' 4.0 COMMUNICATIONS AND MEETINGS <br /> ' NewFields personnel attended a project pre-shift safety meeting conducted by Ames <br /> Construction. <br /> ' If you have any questions or require additional information, please contact us at your <br /> convenience. <br /> ' Sincerely, <br /> NewFields Mining Design &Technical Services <br /> Prepared by: Benjamin Melly. 817.889.7315 <br />