Laserfiche WebLink
■NewFields <br /> Perspective. Vision. Solutions. <br /> FIELD DAILY PROGRESS REPORT <br /> Client: Cripple Creek &Victor Gold Mining Company <br /> ' Project: VLF2 Geomembrane Recertification <br /> NewFields Project Number: 475.0106.026 <br /> Date:June 29, 2018 <br /> ' S M T W T F S <br /> ' Temperature: Low: 58°F to High: 81'F Weather: Clear <br /> NEWFIELDS PERSONNEL <br /> Name Hours <br /> ' Benjamin Melly 13 <br /> Alex Lewallen 8 <br /> ' 1.0 AMES CONSTRUCTION ACTIVITIES <br /> 1.1 Drain Cover Fill Placement <br /> ' Mine Operations delivered Drain Cover Fill (DCF) from the stockpile to placement area between <br /> 9650' elevation and loading area. A Cat D6T LGP dozer was utilized to push and placed the DCF <br /> material between 9650' bench and 9681' elevation in a minimum two-foot lift. <br /> 1.2 Anchor Trench Excavation <br /> ' No activities during the shift. <br /> ' 1.3 Geomembrane Removal <br /> No activities during the shift. <br /> ' 2.0 COMANCO ACTIVITIES <br /> 2.1 Geomembrane Acceptance <br /> ' No activities during the shift. <br />