Laserfiche WebLink
'j <br /> Pinyon <br /> it is recommended that the developer follow MBTA nest survey guidelines as outlined by CPW during <br /> the nesting season (CPW, 2008) (see included Attachment). <br /> • If construction activities occur in mapped wetland and riparian areas, Pinyon recommends that formal <br /> wetland delineations are conducted as described in the USACE Wetland Delineation Manual and a <br /> Section 404 permit is obtained before any ground disturbance occurs (Environmental Laboratory, <br /> 1987). The informal wetland delineation described in this memo is not a formal wetland delineation. <br /> As such, the data and results presented within this memo are for planning and avoidance purposes <br /> only and are not suitable for use in permitting documents. <br /> • Land owners are required to have a plan to manage noxious weeds and, because of the noxious weed <br /> species and the number of noxious weed species present in the study area, Pinyon recommends that <br /> an integrated noxious weed management plan is generated for this site. The plan would help with <br /> managing weeds before and during project activities. <br /> Limitations <br /> This memo was prepared by Pinyon, at the request of and for the sole benefit of Civil Resources, LLC., or any <br /> entity controlling, controlled by, or under common control with Civil Resources, LLC. The conclusions and <br /> recommendations offered in this report are based on the data obtained from a limited number of samples, <br /> within a prescribed study area as described in the text. Soil, hydrologic, vegetation, biological and ecological <br /> conditions typically vary even over short distances, by season, by elevation, and by meteorological conditions. <br /> Thus, the nature and extent of variations outside this biological investigation may not become evident except <br /> through further investigation. It is possible that ecological conditions may change from those observed, <br /> particularly over time. <br /> This memo is the exclusive and present use of Civil Resources, LLC., or any entity controlling, controlled by, <br /> or under common control with Martin Marietta. Ecological analysis has been performed for specific conditions <br /> during the course of this investigation, as described in the text. This study makes no attempt to assess <br /> ecological/biological conditions not searched for as described in the text. <br /> Conclusions stated herein refer only to the specific site at the time of the investigation. <br /> Attachments: <br /> Figure I. Site Location <br /> Figure 2. Biological Resources <br /> Photographic Log <br /> CPW's Recommended Buffer Zones and Seasonal Restrictions for Colorado Raptors <br /> Informal Wetland Delineation and Biological Resources Report <br /> Weld County Gravel Pit Project <br /> November 16, 2017 9 <br />