My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-07-09_PERMIT FILE - M2018036
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2018036
>
2018-07-09_PERMIT FILE - M2018036
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2021 9:49:32 AM
Creation date
7/9/2018 4:32:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2018036
IBM Index Class Name
PERMIT FILE
Doc Date
7/9/2018
Doc Name
Application
From
ZyMin Corporation
To
DRMS
Email Name
ERR
MAC
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ten Percenter Claim: BLM CMC254209; CO DRMS Permit ID No. M-2019-XXX; USFS #2810-021210-MPO-2018-004 <br />Reclamation Cost Estimate All Currently Proposed Disturbance; Life of Operations: 2019 - 2023 <br />Hourly Hours <br />NAME ID PROPOSED DISTURBANCE TYPE LENGTH WIDTH AREA (Sq Ft) AREA (Acres) Equipment 1 Mob -Demob Cost Equip 1 <br />Upper Trench 4.1 4.11 <br />Access Constructed <br />Existing <br />4.12 <br />Dump <br />Constructed/Excavated <br />4.13 <br />Trench <br />Constructed/Excavated <br />4.14 <br />Topsoil Stockpiles <br />Constructed/Excavated <br />Total Planned disturbance to be reclaimed <br />Middle Trench 4.2 4.21 <br />Access Constructed <br />Existing <br />4.22 <br />Dump <br />Constructed/Excavated <br />4.23 <br />Trench <br />Constructed/Excavated <br />4.24 <br />Topsoil Stockpiles <br />Constructed/Excavated <br />Total Planned disturbance to be reclaimed <br />Lower Trench 4.3 4.21 <br />Access Constructed <br />Existing <br />4.22 <br />Dump <br />Constructed/Excavated <br />4.23 <br />Trench <br />Constructed/Excavated <br />4.24 <br />Topsoil Stockpiles <br />Constructed/Excavated <br />Total Planned disturbance to be reclaimed <br />ID PRE-EXISTING DISTURBANCE TYPE <br />1a Access Road Lower Cut Existing Disturbance <br />4a Access Road Upper Cut Existing Disturbance <br />5.00 USFS Un-numbered Road Existing Disturbance <br />Total Existing Distrubance to be Seeded' ONLY <br />Total Disturbance <br />- <br />- <br />- <br />0.000 <br />Actual Costs 2017 <br />200 <br />100 <br />20,000 <br />0.459 <br />320C Excavator $ 500.00 $ <br />65.00 <br />260 <br />225 <br />58,500 <br />1.343 <br />320C Excavator <br />65.00 <br />200 <br />55 <br />11,000 <br />0.253 <br />320C Excavator <br />65.00 <br />Forceast Costs for This RCE <br />89,500 <br />2.055 <br />320C Excavator $ 1,500.00 $ <br />120.00 <br />- <br />- <br />- <br />0.000 <br />320C Excavator <br />120.00 <br />186 <br />55 <br />10,230 <br />0.235 <br />320C Excavator <br />120.00 <br />225 <br />110 <br />24,750 <br />0.568 <br />116 <br />75 <br />8,700 <br />0.200 <br />Reclamation Cost Estimate <br />43,680 <br />1.003 <br />Monitoring and Inspections <br />- <br />- <br />- <br />0.000 <br />110 <br />75 <br />8,250 <br />0.189 <br />200 <br />115 <br />23,000 <br />0.528 <br />100 <br />75 <br />7,500 <br />0.172 <br />38,750 <br />0.890 <br />LENGTH WIDTH AREA (Sq Ft) AREA (Acres) <br />135 12 1,620 0.037 <br />400 10 4,000 0.092 <br />2,200 10 22,000 0.505 <br />27,620 0.634 <br />128,250 4.581 <br />Mob- Hours I Labor Hours <br />... 3 <br />Equipment 2 Demob Hourly Cost <br />4 314 Ton Pick Up $ 50.00 $ 5.00 <br />2 314 Ton Pick Up 5.00 <br />8 314 Ton Pick Up 50.00 5.00 <br />Seed Sub-Totals5 <br />$ 65.00 $ 100.00 <br />65.00 <br />65.00 _ <br />Actual Total Reclamation Cost 2017 = $ <br />910.00 <br />130.00 <br />570.00 <br />1,610.00 <br />8 <br />3/4 Ton Pick Up <br />$ 50.00 <br />$ 5.00 <br />8 $ 65.00 10 $ <br />625.00 <br />3,825.00 <br />16 <br />3/4 Ton Pick Up <br />100.00 <br />5.00 <br />16 65.00 16 <br />3,140.00 <br />24 <br />3/4 Ton Pick Up <br />150.00 <br />5.00 <br />24 65.00 24 <br />4,710.00 <br />48 <br />48 50 $ <br />625.00 $ <br />11,675.00 <br />3/4 Ton Pick Up <br />$ 50.00 <br />$ 5.00 <br />5 $ 65.00 6 <br />465.00 <br />3/4 Ton Pick Up <br />5.00 <br />5 65.00 6 <br />415.00 <br />3/4 Ton Pick Up <br />50.00 <br />5.00 <br />10 65.00 12 <br />880.00 <br />20 24 $ <br />$ <br />1,760.00 <br />Contractor Profit and Admin @ 18.5% <br />$ <br />2,485.48 <br />Administration Fees @ 5% <br />$ <br />671.75 <br />Total Cost - Contract Reclamation <br />$ <br />16,592.23 <br />TOTAL BOND REQUIRED: <br />$ <br />16,600.00 <br />'Pre-existing disturbance will be reclaimed via seeding only on those portions utilized, per USFS communications. <br />z Includes FOG and operator, per DRMS. Actual time and cost is provided for reclamation of area 02 in 2017 <br />3manual labor plus supervisory labor (Davis -Bacon wage rates). <br />4 Actual cost for 5.0 acre disturbance, including seed and seeding (-$125 per acre for seed ). NOTE: 2.0 acres is the maximum allowable distrubance under this permit, therefore, the RCE is much higher than the actual cost to reclaim any un-reclaimed disturbance at the end Operations in 2023. <br />5 NOTE: 2.0 acres of open disturbance is the maximum allowable under this permit therefore, the RCE (etimated to reclaim 4.6 acres) is much higher than the actual cost to reclaim any remaining un-reclaimed disturbance at the end Operations in 2023. <br />
The URL can be used to link to this page
Your browser does not support the video tag.